The hole in the DS Footwell. The hole has been cleaned up with a cut-off wheel. A small patch has been made on the base board and blendid in preparation for the main patch piece. |
|
---|---|
Interior shot of the above. |
|
The patch piece. 3 bends, 3 planes, 1 cut. |
|
My Bender I use the Strong-Tie and the c-clamp to hold the Patch on the edge of the table (which I made). The mini sledge and 2" cold chisel do the bending. |
|
Shop view. |
|
Don't make mistakes welding holes closed, double-check first. A sharpie works great for this. |
|
All tacked up in place |
|
Tacks were made 10 to a session, evenly dispersed. 20 min of cool-down between sessions. |
|
As it stands |
|
The patch ground and blended |
|
Upper profile |
|
Inner detail. More blending still needs to be done. Top right is looking good... |
|
Detail of above |
|