![]() |
Tool advice -Sandy sponge disk -Wire Wheel -Layered Flap disk |
---|---|
![]() |
Bench grinder. Completely necessary for perfecting all of the patch panels. Stone and wire wheel. |
![]() |
The tubing that will be used to create the "ribs" in the footwell. This will be a patch with new challenges. |
![]() |
Tubing mocked up as a rib. The Tubing diameter was too small, so I used a 1/2" solid bar as a mandrel upon which to open the tubing. |
![]() |
|
![]() |
|
![]() |
Perfected and tacked. |
![]() |
I use poster paper to help me create the patch pieces. Start with a tracing. |
![]() |
Cut it out. Transfer to steel. Cut it out. Fit with bench grinder. |
![]() |
The patch count thus far. |
![]() |
Left side patch getting it's final test fitting. |
![]() |
Repairing this hole will require 4 separate patch pieces. 2 ribs and 2 flats. One of each are visible here. |
![]() |
|
![]() |
|
![]() |
All tacked in place. Special attention must be paid to get a good fit for each tack. |
![]() |
|
![]() |
I think it's progressing well. Let's see what Day 5 brings. |